EDGE POWER ESS manufacturing base has been completed

On June 29th, the manufacturing base of EDGE POWER in Bozhou, Anhui Province, was completed and put into operation.

The manufacturing base covers an area of 12,500 square meters, with a storage yard of 3,000 square meters. The manufacturing base is equipped with two PACK production lines, a testing center, a system integration center, and a smart warehousing center. After the assembly of the PACK components, battery cluster testing is carried out in the testing center, and final assembly is completed in the energy storage container assembly area, reaching an industry-leading level. In the future, the Anhui manufacturing base will be capable of producing 5GWh of energy storage products.

HOME    EDGE POWER ESS manufacturing base has been completed
Created on:2024-02-22 17:47